Devon House

Client
Northeastern University London
Devon House
London
Size

44,000 ft²

Type
CAT B
Sector
Public Sector
Duration
32 weeks
Features

A first outside North America

This 44,000 ft², two-phase fit-out brought to life Northeastern University's first campus outside North America. Set in Devon House, St Katharine Docks, it won Project of the Year at Mixology 2023.

Brief

A campus built for how the world learns

For this first Northeastern campus in the UK, the university wanted something entirely new. A diverse, inclusive, maximally flexible space that embodied their global approach to experiential learning. And would help a major American university feel at home inside a traditional English building.

Approach

Construction Image 1

Creating a campus hub

The project began by transforming a large open floor plate into a vibrant environment for learning, collaboration and community. A flexible framework let the space adapt to a wide range of academic and social activities.

Construction Image 2

Bringing identity to the space

We introduced a strong visual language throughout to create a distinctive sense of place. Carefully integrated graphics, finishes and architectural details reinforced the university's identity and created a more engaging experience for students and staff.

Construction Image 3

Designed for collaboration

The completed environment provides a variety of settings for learning, social interaction and informal collaboration. By creating spaces that encourage connection and knowledge sharing, the design supports a more dynamic, engaging student experience.

"We love our Workplace Creations design team! Thoughtful designs, attention to every detail, down to the smallest accessory"

Amy Pace
 / Senior Campus Designer
Northeastern University
Northeastern University
Amy Pace

Features

Features Image 1

A bespoke staircase

The campus’s centrepiece, this feature staircase is framed by biophilia and flows into a curved seating area. This then links directly into the bleacher seating of the main presentation area.

Features Image 2

Learning on the bleachers

A specialist joinery piece that creates height and drama in the presentation zone. Flexible and tiered, it provides a setting for lectures, presentations and collaborative sessions that embodies Northeastern's commitment to experiential learning.

Features Image 3

Switch into a whole new space

Sliding and folding glass walls throughout the campus can open up or close down in moments. So staff and students have the flexibility to reconfigure every space to suit whatever kind of learning is happening that day.

Features Image 4

Award-winning design

This space was awarded Project of the Year: Public Sector & Cultural Interiors at Mixology 2023. Recognition for a campus that set a new standard for flexible, inclusive educational design in the heart of London.

Details

Biophilia, natural materials and warm, inviting tones create a campus that feels welcoming to students from every background. It’s a palette designed to put international learners at ease from day one.

Furniture Selection

Boss Design
Ola Chair
Offecct
Dune
NaughtOne
Lasso Stool
Noti
Bouli
Boss Design
Paloma Chair
Miller Knoll
Ratio 120 Desking
NaughtOne
Pullman
Bla Station
Wilmer
NaughtOne
Ever Sofa
Hushoffice
Hushphone
Hunts
Useme
Miller Knoll
Lino Task Chair
Furniture Studio

Awards

Heading

Winner

Mixology 2023 Project of the Year
Public Sector & Cultural Interiors

A genuinely special win. Our Northeastern University project took home Project of the Year for Public Sector & Cultural Interiors at the 2023 Mixology Awards. The Mixology Awards are one of the most respected names in commercial interiors, and seeing our work for Northeastern recognised on that stage meant the world to the team.

Devon House
Devon House
This is some text inside of a div block.
This is some text inside of a div block.
Cat B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

All Awards

Similar Projects

Robert Half & Protiviti
AIR Building
Solihull

10,979 ft²

CAT B

This 10,979 ft², CAT B fit-out is in Solihull's newly refurbished Air Building. A fully branded, activity-based workplace for 110 staff, it was delivered in 13 weeks and built in line with Robert Half's EMEA design guide.

View Project
Professional Services
10,000–30,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Forvis Mazars
Assembly C
Bristol

8,000 ft²

CAT B

Versatile, future-focused and full of personality. This 8,000 ft² fit-out for Forvis Mazars' Bristol team balances the firm's regional consistency with a bold identity all of its own.

View Project
Professional Services
5,000–10,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

360 Business Parks
63 Grosvenor Street
London

6,264 ft²

Core Works

A sensitive CAT A fit-out at 63 Grosvenor Street, bringing a heritage building back into use without compromising the character that makes it exceptional.

View Project
Landlord
5,000–10,000 ft²
Core Works

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Northeastern University London
Devon House
London

44,000 ft²

CAT B

This 44,000 ft², two-phase fit-out brought to life Northeastern University's first campus outside North America. Set in Devon House, St Katharine Docks, it won Project of the Year at Mixology 2023.

View Project
Public Sector
30,000 ft² and above
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Confidential Client
The Shard, L7
London

8,000 ft²

CAT B

This five-week fit-out relocated our confidential client from 5,000 sqft in the West End to 8,000 ft² on Level 7 of The Shard. We expanded their capacity and improved their positioning without missing a beat.

View Project
Commercial
5,000–10,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Exton Estates
42 Queens Road
Brighton

8,988 ft²

CAT A+

A comprehensive refurbishment across the home of BBC Radio Sussex in Brighton. The scheme comprised CAT A+ and CAT A workspaces, upgraded facilities and a bold new street presence – and all while keeping the station on air.

View Project
Landlord
5,000–10,000 ft²
CAT A+

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

All Projects

Have a project in mind?

Let’s work together

Great projects start with great relationships. Fill out the form and a member of our team will get right back to you.

This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.

This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.

Submit