AIR Building

Client
Robert Half
AIR Building
Solihull
Size

10,979 ftΒ²

Type
CAT B
Sector
Professional Services
Duration
13 weeks
Features

A new national hub for Robert Half

This 10,979 ftΒ², CAT B fit-out is in Solihull's newly refurbished Air Building. A fully branded, activity-based workplace for 110 staff, it was delivered in 13 weeks and built in line with Robert Half's EMEA design guide.

Brief

An inspiring space to grow

When relocating their UK hub from Birmingham to Solihull, Robert Half wanted a workplace that felt like a step up. It needed to align with their global brand, be rich in variety for staff with different working styles, and built to support the business as it continues to grow.

Approach

Construction Image 1

Building the infrastructure

With a large open floor plate to work with, we began by establishing the technical infrastructure to support the future workplace. Close coordination of services, layouts and requirements put the foundations in place for a seamless fit-out.

Construction Image 2

Connecting people and technology

A well-planned raised access floor system distributed power, data and technology services efficiently throughout the space. It gave the flexibility to support changing workplace needs, while keeping the floor clean and adaptable.

Construction Image 3

Designed for modern working

The completed workplace delivers a range of technology-enabled settings that support collaboration, hybrid working and focused tasks. High-quality meeting spaces, integrated booking systems and carefully considered finishes create an environment that is both functional and welcoming.

β€œA huge thank you to the team for delivering an amazing space that has received exceptional feedback from employees”

Jodie Gorin
Β / Project Manager
Global Workplace Solutions
Global Workplace Solutions
Jodie Gorin

Features

Features Image 1

Branded meet and greet zone

We helped create a confident first impression with a branded entrance area. It’s a taster of things to come and ensures the brand identity is established from the moment you walk in.

Features Image 2

Come together and socialising

A generous teapoint and social space sit at the heart of the office. It’s somewhere to step away, recharge and connect, as well as a venue for larger team gatherings and company events throughout the year.

Features Image 3

Training room with tiered seating

A flexible training room can shift from formal boardroom to group workshop to auditorium-style presentation thanks to tiered seating. One of the standout bespoke joinery pieces in a space full of crafted detail.

Features Image 4

Hand crafted and high end

From the V-shaped board table to Β banquette seating, slatted screens and branded signage, this fit out displays master craftsmanship. And a level of quality and character a standard specification can't match.

Details

Shades of red, green and blue, drawn from the Robert Half palette, are complemented by natural hues, architectural details and soft linear lighting.

Furniture Selection

Boss Design
Paloma Meeting Chair
Frovi
Snug Sofa
Orangebox
Allow Me
NaughtOne
Pullman
Boss Design
Flamingo Table
Orangebox
Convo Flip Table
Modus
V Work Table
Balma
Stepps Shelving
Modus
Panda Sofa
Modus
Panda Sofa
Allermuir
Mayze Mobile Seat
Furniture Studio

Similar Projects

Policy Expert
Salesforce Tower
London

12,955 ftΒ²

CAT B

A 12,955 ftΒ² fit-out expanding Policy Expert's workplace across two floors. Not only to increase capacity, but to add flexibility and create an inspiring breakout space centred on the building's dramatic, triple-height atrium.

View Project
Commercial
10,000–30,000 ftΒ²
CAT B
order number
LaSalle Investment Management
Greycoat Stores
London

13,000 ftΒ²

CAT A+

A 13,000 ftΒ² CAT A+ fit-out for LaSalle Investment Management at Greycoat Stores. We created a workspace with a clubhouse feel that leans into the building's industrial heritage while staying adaptable for the widest range of tenants

View Project
Landlord
10,000–30,000 ftΒ²
CAT A+
order number
Global Private Equity Client
Mayfair HQ
London

27,000 ftΒ²

CAT B

Our second major project with the Global Private Equity firm, this ambitious 27,000 ftΒ² fit-out was completed in 28 weeks. And saw our client’s UK head office team relocate to one of London's most distinctive addresses

View Project
Professional Services
10,000–30,000 ftΒ²
CAT B
order number
Commodities Trading Company
Confidential HQ
London

18,000 ftΒ²

CAT B

Contemporary, unbranded and full of personality. This 18,000 ftΒ², two-phase fit-out puts everything a diverse trading team needs in easy reach at the client’s new London HQ.

View Project
Commercial
10,000–30,000 ftΒ²
CAT B
order number
ESP Utilities
Kings Court
Leatherhead

13,000 ftΒ²

CAT B

This nature-inspired workplace was designed to bring a young and growing team back together. A 13,000 ftΒ² CAT B fit-out for ESP Utilities, Β it was delivered at pace against a live and evolving base build.

View Project
Commercial
10,000–30,000 ftΒ²
CAT B
order number
Robert Half & Protiviti
The Shard, L9
London

15,361 ftΒ²

CAT B

On Level 9 of The Shard, this 15,361 ftΒ² CAT B fit-out relocated Robert Half and Protiviti one floor down. And gave two long-established affiliate businesses a shared home with distinct identities and room to collaborate.

View Project
Professional Services
10,000–30,000 ftΒ²
CAT B
order number
All Projects

Have a project in mind?

Let’s work together

Great projects start with great relationships. Fill out the form and a member of our team will get right back to you.

This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.

This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.

Submit