Marble Quay

Client
Northeastern University London
Marble Quay
London
Size

10,936 ft²

Type
CAT B
Sector
Public Sector
Duration
14 weeks
Features

Space to progress

Northeastern University's London staff needed to relocate. This 10,936 ft² fit-out at Marble Quay provided a sophisticated, future-ready workplace for them. It has close links with Devon House, their previous base, while carving out an identity all of its own.

Brief

A grown-up home for a fast-growing team

As the university’s Devon House campus expanded, staff needed to move out to free up space for students. The brief was to create a workplace that felt connected to Devon House in spirit, but with a more refined atmosphere suited to the pace of a rapidly growing team.

Approach

Construction Image 1

Unlocking the potential

The project began by stripping the space back to reveal the building's inherent character and opportunities. Retaining key architectural features set a strong foundation for a workplace that feels distinctive, authentic and connected to its surroundings.

Construction Image 2

Creating a welcoming destination

Hospitality-inspired design principles shaped the employee experience. We introduced thoughtfully designed communal spaces to encourage interaction, create a sense of belonging and offer destinations people genuinely enjoy spending time in.

Construction Image 3

Supporting community and connection

The completed environment brings people together through a variety of collaborative and social settings. By creating spaces that support both planned and spontaneous interactions, the workplace fosters a stronger sense of community while enhancing the day-to-day experience of students and staff.

Features

Features Image 1

Accessible to all  

A DDA-compliant stair lift ensures the building is fully accessible to all staff. A practical addition that reflects Northeastern's commitment to creating inclusive spaces across their London campus.

Features Image 2

A variety of work settings

Open-plan desking, collaboration zones, meeting rooms and quiet nooks sit alongside one another. Giving a diverse staff team the range of settings they need to do their best work, whatever the day holds.

Features Image 3

Space to break out and be social

Dedicated breakout and social areas give the team somewhere to step away from their desks, connect informally and recharge. An important counterbalance in a busy and growing workplace.

Features Image 4

Fully branded, inside and out

New external signage and internal graphics clearly establish Marble Quay as part of the Northeastern London campus. It’s visible from the street and coherent with the wider brand across all campus locations.

Details

Warm tones echo the palette established at Devon House. It’s familiar enough to feel connected to the wider campus, but elegant enough to suit the quieter, more focused atmosphere of a staff workplace.

Furniture Selection

Boss Design
Ola Chair
Orangebox
Lapwing Table
Orangebox
Bae Table
NaughtOne
Always Chair
HitchMylius
Drum Stool
NaughtOne
Hue Low Booth
Icons of Denmark
Crossover Chair
Max
Hush Meet Booth
Boss Design
Ola Stool
Furniture Studio

Similar Projects

ESP Utilities
Kings Court
Leatherhead

13,000 ft²

CAT B

This nature-inspired workplace was designed to bring a young and growing team back together. A 13,000 ft² CAT B fit-out for ESP Utilities,  it was delivered at pace against a live and evolving base build.

View Project
Commercial
10,000–30,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Confidential Client
The Shard, L7
London

8,000 ft²

CAT B

This five-week fit-out relocated our confidential client from 5,000 sqft in the West End to 8,000 ft² on Level 7 of The Shard. We expanded their capacity and improved their positioning without missing a beat.

View Project
Commercial
5,000–10,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Robert Half & Protiviti
The Shard, L9
London

15,361 ft²

CAT B

On Level 9 of The Shard, this 15,361 ft² CAT B fit-out relocated Robert Half and Protiviti one floor down. And gave two long-established affiliate businesses a shared home with distinct identities and room to collaborate.

View Project
Professional Services
10,000–30,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Berenberg
60 Threadneedle Street
London

24,000 ft²

CAT B

This was our third major project with Berenberg, one of the world’s oldest investment banks. The 24,000 ft² seventh-floor fit-out consolidated teams from two floors in the same building into one of the largest investment research floors in the City. And created a landmark multi-use hub at its heart.

View Project
Professional Services
10,000–30,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

360 Business Parks
63 Grosvenor Street
London

6,264 ft²

Core Works

A sensitive CAT A fit-out at 63 Grosvenor Street, bringing a heritage building back into use without compromising the character that makes it exceptional.

View Project
Landlord
5,000–10,000 ft²
Core Works

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Robert Half & Protiviti
AIR Building
Solihull

10,979 ft²

CAT B

This 10,979 ft², CAT B fit-out is in Solihull's newly refurbished Air Building. A fully branded, activity-based workplace for 110 staff, it was delivered in 13 weeks and built in line with Robert Half's EMEA design guide.

View Project
Professional Services
10,000–30,000 ft²
CAT B

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

All Projects

Have a project in mind?

Let’s work together

Great projects start with great relationships. Fill out the form and a member of our team will get right back to you.

This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.

This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.

Submit