13,594 ftΒ²
A sustainable workspace, pre-let before breaking Β ground
A CAT A+ fit-out at 138 Cheapside, this 13,594 ftΒ² project repurposed an existing CAT B shell and tailored it for incoming tenant, Hollis. It was pre-let before work started on site and delivered in 15 weeks.
Brief
Repurpose, adapt and reframe
Following our successful delivery of Levels 4 and 5 at this address, Endurance Land asked us to reimagine Level 3 as a new CAT A+ space. They wanted to reuse as much of the existing CAT B infrastructure as possible, while adapting the layout to meet the specific requirements of prospective tenant Hollis and their 120-strong team.
Approach
Details
A neutral, bright base is lifted by warm timber, antique brass details and carefully placed biophilia. Itβs a palette clean enough for the incoming tenant to make their own, and characterful enough to make a strong first impression.
Furniture Selection
Gallery
Similar Projects
Have a project in mind?β¨
Letβs work together
Great projects start with great relationships. Fill out the form and a member of our team will get right back to you.
This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.
This site is protected by reCAPTCHA and the Google Privacy Policy. Terms of Service apply.