The Learning Experience

Services

Sector

Location

Year

2023

Size

9,800 ft 2

Duration

26 Weeks

Location

Leatherhead

Features

Multiple Age Specific Classrooms, Classroom Bathrooms, Full Catering Kitchen

Deliverables

M&E Strip Out and Re-Installation, External Ground Works, Specialist Security Door Installation

Transforming a traditional office building into a cutting-edge early learning centre.

The Challenge

Completing the complex conversion from traditional office building to state-of-the-art nursery.

The existing office space required significant reconfiguration and fit-out to meet the specific needs of a modern early years facility. We collaborated with a wider professional team to ensure the design met the specific needs of the The Learning Experience's (TLE's) standards. We became trusted advisors for the complex strip-out, fit-out, and construction phases.

The comprehensive design plan incorporated classrooms, specialised play areas and essential facilities. Our specialist teams handled complex aspects like mechanical installations, structural modifications, and external groundwork.

What We Did

The transformation of the building presented unique challenges.

The initial phase involved the complete removal of the existing office layout. Walls needed to be strategically dismantled to accommodate new classroom configurations and play areas. Additionally, existing raised access flooring posed a hurdle. Its removal was necessary to create a more suitable surface for young children and to allow for the installation of new, specialist floor coverings that met safety and hygiene regulations.

Removing the raised access flooring not only addressed safety concerns but also allowed for the introduction of a new internal secondary staircase. This additional stairwell enhanced accessibility within the nursery and ensured compliance with fire safety regulations for childcare facilities.

A significant challenge arose from the necessity of integrating a completely new M&E system within the existing building's shell. The existing office infrastructure was simply not equipped to handle the demands of a modern nursery. Our team of MEP specialists tackled this hurdle by strategically installing a comprehensive new system throughout the remodelled space. This new system ensured proper ventilation, heating, and plumbing – essential elements for creating a comfortable, healthy, and energy-efficient learning environment for young children.

Necessary structural works included lifting pre-cast concrete floor planks on the ground floor to create new drainage connections, a vital aspect of the new M&E system.

Transforming a traditional office building into a vibrant nursery presented a unique set of challenges, but through careful planning, innovative solutions, and collaboration, we ensured a successful . outcome that exceeded expectations.

Related Projects

44,000 ft2

CAT B Design & Build

Northeastern University - Devon House

A state of the art campus for the world leaders in experiential learning.

7,200 ft2

Refurbishment

American Express

Drawing people back into the office post pandemic as a welcoming and efficient destination to work from.

24,000 ft2

CAT B Design & Build

Berenberg

A new way of working for one of the World's oldest investment banking firms.

4,000 ft2

CAT B Design & Build

Jellyfish - Warrington

Developing a space that reflects the dynamic and innovative brand.

5120 ft2

Refurbishment

Brand Addition

A reimagined workplace representative of Ba's new branding and cultural aspirations.

3,400 ft2

CAT B Design & Build

Illuminate Skin & Wellness Clinics

Illuminate are an award-winning aesthetic, skincare and wellness clinic.

44,000 ft2

CAT B Design & Build

Northeastern University - Devon House

A state of the art campus for the world leaders in experiential learning.

7,200 ft2

Refurbishment

American Express

Drawing people back into the office post pandemic as a welcoming and efficient destination to work from.

24,000 ft2

CAT B Design & Build

Berenberg

A new way of working for one of the World's oldest investment banking firms.

4,000 ft2

CAT B Design & Build

Jellyfish - Warrington

Developing a space that reflects the dynamic and innovative brand.

5120 ft2

Refurbishment

Brand Addition

A reimagined workplace representative of Ba's new branding and cultural aspirations.

3,400 ft2

CAT B Design & Build

Illuminate Skin & Wellness Clinics

Illuminate are an award-winning aesthetic, skincare and wellness clinic.

44,000 ft2

CAT B Design & Build

Northeastern University - Devon House

A state of the art campus for the world leaders in experiential learning.

7,200 ft2

Refurbishment

American Express

Drawing people back into the office post pandemic as a welcoming and efficient destination to work from.

24,000 ft2

CAT B Design & Build

Berenberg

A new way of working for one of the World's oldest investment banking firms.

4,000 ft2

CAT B Design & Build

Jellyfish - Warrington

Developing a space that reflects the dynamic and innovative brand.

5120 ft2

Refurbishment

Brand Addition

A reimagined workplace representative of Ba's new branding and cultural aspirations.

3,400 ft2

CAT B Design & Build

Illuminate Skin & Wellness Clinics

Illuminate are an award-winning aesthetic, skincare and wellness clinic.